Dwell scheduling algorithm based on analyzing scheduling interval for digital array radar
DOI:
Author:
Affiliation:

Funding:

Ethical statement:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
    Abstract:

    Aiming at the problem of beam-dwell scheduling for digital array radar,the algorithm based on analyzing scheduling interval was studied. This algorithm analyzed the dwells applied to be executed in one scheduling interval and introduced pulse interleaving. The scheduling criterion took both priorities and deadlines into account fully,with the Task Drop Ratio,Hit Value Ratio,Time Utilization Ratio as evaluation indexes. The simulation results showed that the modified deadline criterion mainly emphasized the urgency of tasks,while the modified priority criterion mainly emphasized the importance of tasks;the deadline-priority and priority-deadline scheduling criterions could make good balance between urgency and importance,thus superior to other criterions in overall performances.

    Reference
    Related
    Cited by
Get Citation

赵洪涛,程婷,何子述.数字阵列雷达波束驻留调度间隔分析算法[J]. Journal of Terahertz Science and Electronic Information Technology ,2011,9(1):17~21

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
History
  • Received:June 30,2010
  • Revised:August 02,2010
  • Adopted:
  • Online:
  • Published: